Flow rate from 40% to 100%

An additional sidetrack produces 40% to 100% incremental flow rate, while well construction costs are only 15% to 20% higher

Savings from 30 mln rubles

Only during construction of a multilateral well

Multilateral technology and performance criterias

Drilling casing string sections
Drilling casing hole sections, such as conductor, surface casing, intermediate and production casing, takes 70% to 90% of costs and rig time.
Drilling liner sections
Drilling liner sections takes 8% to 15% of costs and rig time. Due to high costs at the initial stage, oil production is not very cost effective.
A sidetrack gives the following benefits
With 15% to 20% higher completion costs, our customers can improve flow rates by more than 2 times from one well. One well can have from 2 to 5 additional side tracks.
70 15 15
75 10 15
0 50 50
70 85 100
75 85 100
0 50 100