TAML 5 completion level

ADL Completions works on high potentional ML system for worldwide demand. The industrial name of the system – TAML 5
The main advantages of the system are:

  • The biggest ID’s of the main and lateral in the industry;
  • Pressure integrity of the junction;
  • All type of the lower completions in the main and lateral hole (frac BHA, Plug and Perf and etc.);
  • One-trip junction installation operation;
  • Size’s from 7’’ till 10 3/4 ‘’
    The «Victory» should cover demand on the levels from TAML 2- till TAML 5.